54-inch Sewer Line

S&B Infrastructure, Ltd. (S&BI) was responsible for the construction of approximately 14,720 linear feet of 54-inch Sanitary Sewer Trunk Lines on Renwick Drive from North Braeswood Boulevard to Gulfton Drive which includes: Concrete Manholes, Vent Pipes, Precast Concrete Manholes, 36-inch Sanitary Sewer stub-out, 36-inch Force Main stub-out, Watertight Manholes, Cast-in-Place Junction Box, Connection of existing two 26-inch Force Mains to Junction Box, Fill with Grout and Abandon in Place 12,824 linear feet of existing 26-inch Force Main, Fill with Grout and abandon 8,242 linear feet of existing 36-inch Force Main, abandon 15 existing Sanitary Sewer Manholes, Relocation of existing 8-inch water line and appurtenances.

 

The work also includes site and pavement restoration, tree protection, storm water pollution prevention, and traffic control in relation to the construction of the 54-inch Sanitary Sewer Gravity Trunk line.

© 2019 S & B Infrastructure, Ltd. (S & B).  All Rights Reserved.

Member of the National Society of Professional Engineers
Member of the Society of American Military Engineers
Member of the Texas Society of Professional Engineers

Our Mission is to provide solutions for transportation, pipeline, public works, federal and emerging technology challenges by exceeding our clients’ expectations with unmatched innovative services, flexibility, quality, and responsiveness.