Tidwell Water Transmission Main

S&B Infrastructure, Ltd. (S&BI) designed this water transmission main. The project consisted of horizontal and vertical alignment for 7,800-feet of 54-inch in diameter water transmission main and separation distances from existing sanitary sewers were key issues. A TxDOT permit was required as part of the alignment was within TxDOT Right-of-Way.

 

The project included:

  • Preparation of plan and profiles

  • Development of traffic control plan

  • Development of erosion control plan

  • Preparation of standard details for water, sanitary, storm and road restorations

 

The water main included five high points with air release/vacuum valves located in manholes.

© 2019 S & B Infrastructure, Ltd. (S & B).  All Rights Reserved.

Member of the National Society of Professional Engineers
Member of the Society of American Military Engineers
Member of the Texas Society of Professional Engineers

Our Mission is to provide solutions for transportation, pipeline, public works, federal and emerging technology challenges by exceeding our clients’ expectations with unmatched innovative services, flexibility, quality, and responsiveness.